364 Matching Annotations
  1. May 2020
    1. If your equipment group, for example, Rigging has a usage period from 21-12-2020 (14:00) to 24-12-2020 (14:00), it is exactly 4 days. In your factor list, you can see this gives a factor of 2.40:

      4 days, + new image

    1. oup_work Warehouse module, you can mark an item or serial number as either "Lost" or "Defect"

      Add symbol + not italics but double quotations

    1. Go to the settings Configuration module > Financial > Financial. Under "Terms and conditions", drop a file or click to upload.

      Add symbol, delete image and change Slips to "Terms and conditions"

    1. Afterwards, you can filter the shown items in a module by clicking on the label tags expand_more button and selecting your tag(s).

      Change sentence and add tags button

    1. label tags or filter_list filters active.  Remove your filters, and/or de-select all tags. In modules such as the table_chart Projects module, make sure to choose a long time period.

      Add symbols

    2. Select  the items you want to archive. Click the More actions more_vert button. Choose "Archive".

      Button, more actions and double quotes

    1. Click on one of these notifications to directly go to the project request. In the project request list, each project is waiting for your rejection or approval.

      Changed the text a bit

    1. Some useful presets are: Confirmed projects - Has filter 'Is confirmed'. Option projects - Has filter 'Is option'. My confirmed projects - Has filters 'Is confirmed' and fixed value for 'Account manager'. My option projects - Has filters 'Is option' and fixed value for 'Account manager'.  To be planned - Has filter 'Crew required' and 'Is confirmed'.

      Better ordered the useful presets

    2. To choose a view in the Projects module: Click on list View: List expand_more button on the top-right of the module (if the view is on 'List'). Choose your preferred view.

      Different steps

    3. Projects highlighted in light blue are in status Option or Concept. Projects in black are in status Confirmed, Prepped, In location or Returned. Greyed out projects are in status Cancelled.

      Indicators are changed

    1. Subrental options

      Delete Location, add 'Contact person'. Add symbol. Change italics to single quotation marks. Bring 'Subrent type' up

    1. Add a subrent In the sub-folder Subrentals or in the Equipment tab of a project, you can add a new subrent for the needed equipment items. 

      Two possibilities

    1. Select  the kit Click on the More actions more_vert button. Choose 'Edit kit price based on content'.

      Button, symbol and single quotation mark

    1. Critical stock

      Add symbol + delete image. Currently it's not possible in the improved interface, but it probably will be there in the future.

    1. Select  an item in your project and click the More actions more_vert button  Choose 'Assign serial number'. The pop-up screen that opens shows an overview of your serial numbers and their availability. Select your preferred serial number and choose  Confirm  to book it for the project.

      Add icons/buttons

    1. Go to settings Configuration > Account > Extensions. If deactivated, click Connect in the 'API' field. Click Show token.

      Different steps

    1. Scroll down to Files  Click directly on the file and click  Download  or click on the three dots more_vert to download.

      new steps

    1. Go to the settings Configuration module > Settings > Extra input fields. Click + Add extra input field and fill in the following information:

      Changed buttons

    1. Use tags, filters and presets Click on the label Tags to filter by tags you have added to the task. Click on the filter_list Filters button to select filters. Think of filters as Completed, Not completed and Public (yes/no) Click on the blue text in the top left corner to select presets. Select a display periodThis determines and how far back/forward in time tasks should be displayed. Click on the calendar in the top left corner: date_range Save selection as presetYou can save your configuration as a (new) preset. This allows you to quickly switch between different presets within the Tasks module. Click on the blue text in the top left corner and click Save preset.

      Changed structure

    2. Go to one of the modules, double click on i.a. an equipment item, a contact or a vehicle to edit it. Scroll all the way down and click Add task Configure your task options and click Save

      Changed steps

    3. Tasks can be added in the Equipment, Contacts, Crew members, Vehicles, Subrents and Repairs modules.

      Tasks can't be added to invoices anymore

    4. Examples of tasks Projects: Contact customer X days before the project to check in on their wishes. Projects: Ask for customer's feedback X days after the project has ended. Contacts: Check in with an important lead to keep the contact warm. Vehicles: Bring to garage for yearly MOT.

      Placed it under Add a task

    1. Number series - Choose the default number series for quotations, contracts, invoices and credit notes that should be used for projects with this project type. Additional conditions - Choose the default additional conditions that should be used for projects with this project type. 

      Add

    2. Warehouse packing slip template - Choose the default packing slip template that should be used for projects with this project type.

      Add

    1. Split or merge a subproject When you split a subproject from the main project, it turns into its own main project. In a project, click subprojects expand_more to show subprojects. Next to a subproject, click on the downwards arrow: Choose call_split Split When you merge subprojects, all subprojects will be merged into one main project. If you merge subprojects with different statuses, the merged project will get the status of the subproject you've selected before merging. In a project, click subprojects expand_more to show subprojects. Next to a subproject, click on the downwards arrow: Choose merge_type Merge with others.

      Different steps

    2. In a project, click subprojects expand_more to show subprojects. Click on a subproject and go to the Time schedule tab. Use the dots to drag the time period from the main project to a subproject.

      Different steps

    3. In a project, click subprojects expand_more to show subprojects. Click on a subproject and go to the Time schedule tab. Use the dots to drag the time period to the main project.

      Different steps

    1. Go to the Time schedule tab. Select a time period and click  Set as default time. In the pop-up, select whether the default time is for the planning period, usage period or both.  In the pop-up, select either to apply to the entire project or a subproject only. 

      New steps

    1. Project ProgressThe icons in project progress indicate which steps you have finished in your projects. These are the icons: The color gives an indication of what still has to be done. A red 'Crew & Transport' means that not all functions are fully planned on a confirmed project yet. The green color indicates that nothing has to be done. A yellow invoice icon means there are still unpaid invoices. Hover with your mouse over the icons to see more information. Click on them to go the corresponding tab.  Tasks/notes/filesRead our article about Tasks/notes/files for more information.

      New (tasks/notes/files refers to different article than the 'notes' link)

  2. Apr 2020
    1. Example template On the right of the screen in the widget, you can choose an existing document to display as an example. This is useful to see what your template will look like with example information. Letterhead On the right of the screen, you can choose a default letterhead for this template.

      'On the top' is changed to 'on the right' and change the image