12 Matching Annotations
  1. Oct 2025
    1. Planning load management

      I'm somehow missing the transition from general networks to the networks of charging stations. Should we consider the charging station networks on this level at all, or better to handle it as an use case example?

    2. Plan your power supply and circuit breaker locations Consider distances between devices; keep under 50m per hop when possible. See Distance guidelines below. Decide if you need one network or multiple networks Plan your load management approach

      Should here be a period at the end of each point? It should be at least consistent.

    1. Red for 5 sec. Node booting after restart or power cycle. Steady red Node not connected to a MultiNode network; ready for configuration. Steady white Node connected to a MultiNode network. White: 1.8 sec. on / 0.2 sec. off Node connected but configuration incomplete. White/red alternating, 0.3 sec. each Firmware update in progress. Red flashing, 0.5 sec. on/off

      Is it not better to use standard SI unit notation like "5 s" instead of "5 sec."? It looks somehow strange, at least for me.

    1. PLC: Sends network data through your home’s electrical wiring.

      Unexpected explanation for PLC. Expected: Power Line Communication, probably with more description.