      Why the title is Up/Down? Does "these process" refer to the customer's operational process that is performed by the resource assets?

    Annotators

  2. Dec 2020
    1. The costs of tests in accordance with the normal validity of the attestation defined in the procedural rules must be borne by the ASP.

      Prequalification test costs should be borne by the ASP

    2. technical and organisational requirements for the provision of primary control power

      Search for where it is described. In particular the designated communication line. Where is it?

    Annotators

    1. What is "Secondary Control"?

    2. Negative power and positive power Positive Power equals more or less to "Negawatt"

    1. No working fee

      ? No positve/negative, that means no commitment i.e. kW?

      In FCR, we are talking about Power (performance), not Energy (provision)?

      Or, does it mean that there in no kWh paid

      • I recall that in the DR seminar there was kWh is netted.
    2. Consumption and production in the electricity grid to be in balance at all times

      Control Power / Control Energy

      • Control Power - Commitment kW
      • Control Energy - Deliverable kWh
    3. Balancing Energy

      Distinction of Control Energy and Balancing Energy