334 Matching Annotations
  1. Nov 2020
    1. Project status at a glance Don't feel like opening up a project to see the status? Neither do we. You can quickly view whether a project is cancelled, confirmed, or not yet confirmed in various places in the  table_chart Projects module. This can help you decide which (sub)projects need immediate attention and which can wait. Status indicators Actual Status Status Group From within the project List / Per day view Timeline / Calendar view Cancelled Cancelled Project name ApplicationConceptPending Unconfirmed Project name ConfirmedPreppedOn LocationReturned Confirmed Project name  From within the project From within the project, traffic light symbols are used to indicate subproject status. You can easily see at the top of the page what the status of the active subproject is (in the below image, New York has a red dot, as it is cancelled). By hovering over any dot, a text will pop up explaining exactly what the the status is for that (sub)project (in the below image, we see that for the World Tour, the "status varies per subproject"). List / Per day view Timeline / Calendar In the calendar or timeline view of projects, the color of the project is determined by the project type. This is not to be confused with the project status. In the image below, we can see that we have one cancelled project (struck through), two confirmed projects (normal), and one project not yet confirmed (italicized).  

      and screenshots

  2. Aug 2020
    1. The VAT number field should include your company's identification number for value added tax purposes (this can also be a GST number). If you do not have a VAT number, please check  the box below the input field.

      moved and screenshot

    2. If you have tested a higher number of power users than the one you are activating, you will have to reduce the number of power users after activating.If you want to activate a Lite or Classic license after a Pro/Classic trial, Rentman will ask you to edit some settings.

      moved

    1. In this example, 3 power user roles are currently assigned. If your license covers 11 powers user roles in total, you still have 8 power user roles left to assign. 

      update numbers

    2. A Rentman account always includes 1 power user by default. In this example, we also have 10 extra power users. Therefore, this license covers 11 power users in total.

      update numbers

  3. Jul 2020
    1. UPDATE

      Version 3 updates - GIF updpated, decide for yourself if it's worth it. It's only slightly different from the old interface. Look for parkiepants comment

    1. Projects names are written in different colors so you can better distinguish what their status is: Blue: Application - Concept - Pending Black: Confirmed - Prepped - On location - Returned Gray: Cancelled

      Changed and added bullets

    1. With the Warehouse module If you want to book your equipment in the Warehouse module: Go to the Equipment tab of the project. Double-click on the equipment group to edit it. Assign the group a planning period, so it will be shown in the Warehouse module. Go to the group_work Warehouse module and click on "Book". Click "Everything to location". In the pop-up window, change the project status to "Returned", then save.

      Updated and consolidated

    2. After your quote is signed and the project is confirmed, you can either book your equipment in the Warehouse module or manually adjust the stock quantity of your sale items.

      Consolidated, deleted an unnecessary section

    1. This is the level at which you would like to replenish this item, in order to avoid running out completely. You have the option of filter_list filtering for all items that have reached their critical stock level in the category Equipment module. You can also display this information in a personalized dashboard in the dashboard Dashboard module.

      added

  4. Jun 2020
    1. In the Action dropdown field, select "Invite" (Optional) Add additional days/times to the invitation Select the Invitation type Set the due date (deadline for the crew member, to respond to the invitation) (Optional) Add additional crew members Add a message (optional: create/apply a template) Click  Invite

      all pretty new and changed

    2. At the top of the left column, click the dropdown menu to select "Crew members" or "Vehicles" Select your desired crew member(s) or vehicle(s) and click watch_later to open the lower timeline In the timeline, you will see their availability for the selected time period Click and drag your cursor in the timeline (on the same level as the crew member's name) to select a time period In the Action dropdown field select "Mark as reserved" Click Select

      all pretty new and changed

    1. In the example above this crew member is unavailable on Wednesday, available on Thursday, and on Friday their availability is unknown. the 3rd and the 4th.

      updated and replaced screenshot

    2. In either the Crew scheduling tab of a project or the account_circle Crew planner module, select a function to see which crew members are available

      added to and styled

    1. Green function: visible for all crew members planned on a function   Orange function: invisible for one or more crew members planned on a function  Dark blue crew: crew member can see that he is planned on a function  Light blue crew: crew member can NOT see that he is planned on a function 

      changed and screenshots

    2. Click "Make planning visible to crew members" (all crew planned on that function) or "Switch visibility for crew member" (just one crew member)

      styling changed and expanded upon

    3. In the timeline, right-click on a planned crew function (to switch visibility for all crew planned on that function) or a planned crew member (to switch visibility for just one crew member).

      expanded upon and screenshot

    1. Request availability for times of function: the crew member will receive an email with the question "Are you available for this period?". If the crew member chooses "Yes", the crew member is shown as available. If "No" is chosen, the crew member is shown as not available. No project or function details are shown. After confirmation directly visibly planned on function: the crew member will receive an email with the question "Are you available for this position?". If the crew member chooses "Yes", the crew member is immediately scheduled for the position. After confirmation invisibly planned on function: the crew member will receive an email with the question "Are you available for this function?". If the crew member chooses "Yes", the crew member is planned invisibly for the function.

      Bulleted, bolded, and copy/pasted content from the little info boxes in the browser

    2. Good to know: The invitation will be sent within 15 minutes. Multiple invitations within 15 minutes will be combined into one email with multiple options. Invitations can also be received and answered in the Rentman Mobile app. Click on "Invitations" in the app and you will see an overview of all outstanding invitations. Push notifications can be sent to the app for new invitations. Make sure Rentman Mobile has the rights to send push notifications in the app settings and the notifications in Rentman Web have been set up correctly.

      Condensed, rephrased, and bulleted

    1. Indicate if you want to import import contact persons associated with your contacts. Upload a contacts file in accordance with the "Terms" listed. Indicate if your file contains a header (column titles) in the first row and match the Rentman columns with the columns in your file.  

      Totally new, plus screenshot

    2. Select the type of import you want to do: "Import all rows as new item" - your contact database is empty and this is your first import "Update existing items with new data" - you have contacts already imported and want to update their details "Add new items and skip existing ones" - you have contacts already imported and want to add more contacts

      Totally new

    1. On location - This is the equipment of projects that are taking place. You can toggle between: All projects on location  Only projects expected back that day 

      reworded and screenshots added

    1. Periodic inspections first need to be configured in the settings Configuration module. Here you will determine how often each inspection will take place, and what exactly needs to be checked.

      new-ish and adopted from a paragraph deleted in original article

    2. Inspections overview, fill in the Periodic inspection field (previously set up in the settings Configuration module - paragraph above).

      rephrased + new content

    3. For example: A rigging inspection is normally done every 6 months. During a rigging inspection, all hoists, chains and other accessories need to be visually examined.

      taken from merged article

    1. You can always find your repair slip when you select the included equipment items in the build Maintenance or category Equipment modules and click "Details".

      changed

    1. If you planned sale items (i.e. consumables) on a project, when returning your equipment to the warehouse, you must leave the ones you used on location. When moving equipment from "On location" to "Brought back", you can enter the unused (remaining) quantity of your sales item and press . The quantity that comes back will be accounted for in the stock level of the item.

      Changed and condensed this section, screenshots. Pretty sure either this was written wrong, or the behavior was flipped.

    2. You have two options for manually booking equipment (without scanning): Click on    or  to book one piece of equipment at a time. Click "Everything to..." to book everything at once.

      Completely replaced this section with this

    3. Here you can see basic information about the item such as the name, the quantity of the item planned (5), the amount that still needs to be booked out (3), assigned serial numbers, and more. You can view equipment notes or add a new note. Click on the More options more_vert button of equipment in the warehouse to view the equipment image (added in the category Equipment module), split items, or plan alternative items.

      This is all completely new and replaced the old table that was here

  5. May 2020