2 Matching Annotations
  1. Mar 2020
    1. the start-up (achieving 70% TN removal) was shortened from 21 days to 5 days when Anammox sludge concentration increased from 0.02 g VSS L−1 to 0.2 g VSS L−1 with 2 g VSS L−1 AS as inoculum
    1. Hydrazine addition resulted in much higher anammox biomass enrichment observed as higher nitrogen removal rate [0.512 kgN (m3 d)−1 with hydrazine versus 0.256 kgN (m3 d)−1 without reagent]