- Feb 2025
-
web.hypothes.is web.hypothes.is
-
you will need to activate Hypothesis on each page you wish to annotate.
This is indeed unfortunate, I'll be looking for a way to make a feature request to the developers to at least show when annotations are available either from myself or others.
-
-
freakonomics.com freakonomics.com
-
ALLENSWORTH: The board members — I’m giving them the most credit possible — without fully realizing, they’re saying, “They’re not going to be able to take private insurance. They’re not going to be able to work in the highest-end hospitals. They’re going to be doing things like working in prisons, working for the V.A. And that’s not really the set of patients that I’m super-worried about protecting. Those patients are lucky to get care.”
Wow, what a commentary on V.A. healthcare
-
-
www.tablerockhistoricalsociety.com www.tablerockhistoricalsociety.com
-
Herman Brauer was my granduncle, and of course, I never knew him personally. Yet, having served in the military during the Viet Nam conflict, I feel I can relate to him in some ways, beyond kinship. In some ways I do wish I had known this man and could have a little talk.
-
- Sep 2024
-
www.intertek.com www.intertek.com
-
Standards Update Notices (SUN)
Note: an update was removed, see Archive.org 30 Aug 2023 SUN - UL 1973, Batteries for Use in Stationary, Vehicle Auxiliary Power and Light Electric Rail (LER) Applications [ANSI/CAN/UL 1973:2022 Ed 3] Check Archive.org
-
- Mar 2024
-
www.belfuse.com www.belfuse.com
-
Part Status: End of Life
No replacement identified
-
- Feb 2024
-
mychart.uchealth.org mychart.uchealth.org
-
Nuclear Stress Test Thursday February 15, 2024 Arrive by 1:00 PM MST Starts at 1:15 PM MST Add to calendar Appointment Location: UCHealth Heart and Vascular Clinic - Harmony Campus 2121 E Harmony RdBuilding AFort Collins CO 80528970-221-1000Get directions
Patient Estimate Line says $6938.00
-
- Dec 2023
-
tyndaleusa.com tyndaleusa.com
-
Arc Flash PPE Categories for DC Systems: In Section 130.7(C)(15)(b), the table that outlines arc flash PPE categories for DC systems, such as storage batteries, DC switchboards, and other DC supply sources, has been updated. The value range requiring arc flash PPE has increased from 100 – 250 VDC to 150 – 600 VDC. This change is supported by recent test data for a maximum arc duration of 2 seconds and a minimum working distance of 18 inches.
This is a significant change from the 2021 edition, and makes it unnecessary to assign PPE levels to our ESS Battery Trays.
-
- Jun 2023
-
www.electricaltechnology.org www.electricaltechnology.org
-
What a horrible web site design. there is literally an ad separating every single paragraph. Dozens!
-
- May 2023
-
www.dekra.com www.dekra.com
-
See Wikipedia Swiss Cheese Events
-
-
www.liquidplanner.com www.liquidplanner.com
-
1. Prioritize What’s Urgent
DO NOT CONFUSE, Urgent and Important. See the Eisenhower matrix
-
- Jan 2023
-
www.wallpapertip.com www.wallpapertip.com
-
This is a non-functional circuit. It's pretty obvious the artist has no knowledge of electronics by the way all the IC ships are arranged. I would never use this as I would be the laughing stock of my colleagues
-