2 Matching Annotations
  1. Dec 2019
    1. My suspicion is, a good KPI for a knowledge tool is minimum threshold of time required to make a negentropic update to it, with every halving of the threshold increasing its capacity to hold positive-interest-rate knowledge repos by an order of magnitude.

      some adhoc loss func

    2. This btw is the maker time/manager time problem pg wrote about. Making needs 4 hour chunks because anything less tends to increase entropy rather than decrease it in any non-trivial knowledge work project. So anything that lowers that lower limit is a big win.

      <4h intense focus increases entropy (more stuff, less structure) in your brain